
Kitchen & bath · Connecticut
Kitchens and baths, done by the same crew.
- Kitchen
- 3–8 weeks
- Bath
- 2–5 weeks
- Drawings
- Before demolition
- Territory
- Connecticut
What it usually costs
Baths $12,000–$35,000 · Kitchens $25,000–$85,000
Planning ranges for a full bath or an everyday kitchen. Fixtures, cabinets, and hidden wet-wall work move it. Drawings before demolition.
What the job includes
One crew that has already been in the attic.
The same people who have seen the roof deck, the plumbing vents, and the electrical panel are a better bet in a wet wall than a specialist who meets the house on demolition day. We sequence the messy trades, protect the rest of the house, and don't disappear between rough-in and tile.
Kitchens built to be used.
Layouts that put the sink on the window when we can, storage where you actually stand, and finishes that will still look right in ten years. We're not a showroom. We'll tell you when a trend is going to look dated before the caulk cures.
Baths that don't leak into the kitchen.
Waterproofing is the job. Tile is the part you see. We treat pans, niches, and curbs like they're the reason you hired us — because a pretty bath that weeps into a ceiling is a callback, not a remodel.

Questions
Common questions
Also available
Other work we do

Windows & doors
Replacement windows and exterior doors measured to the opening that's there — not a catalog size forced into an old wall.

Heating & air
Furnaces, heat pumps, and central air — sized for a Connecticut winter, not a catalog climate.

Siding
Fiber cement, vinyl, and wood siding — flashed correctly, finished so the house looks like one job.
Ready for a quote?
Enter the address for a planning estimate, or book a visit. Or just call.
