Remodels
Kitchen and bath remodels in Connecticut — planning numbers
Baths typically $12,000–$35,000. Everyday kitchens $25,000–$85,000. Same licensed crew that already knows the house. Drawings before demolition.
Draw it before you demolish
Baths 2–5 weeks, kitchens 3–8
Same crew if we already know the house
$12–85k
Baths $12–35k · kitchens $25–85k

The range is not the bid
A full bath on a typical Connecticut house — new tile, a decent shower, fixtures that will last — runs $12,000–$35,000 and two to five weeks. An everyday kitchen, not a magazine gut, $25,000–$85,000 and three to eight. Cabinets, moving a wet wall, and what we find in the plaster are what leave those bands.
We draw it before we demolish. If the answer is 'we'll know when we open the wall,' that is not a plan. Hidden rot and a panel that cannot take a new range get written as allowances, not surprises.
One crew that already knows the house
If we just did the roof, the siding, or the mechanicals, we have already been in the attic and the wet walls. That is the point of Helio GC as a general contractor, not a kitchen showroom that has never seen your flashing. Ask for the kitchen and the bath on the same visit brief — we will say if the house can take both in one stretch.
