Solar

Do you need a new roof before solar in Connecticut?

If the shingles have less than about fifteen years left, replace the roof before or with the array. Helio GC installs both so you are not paying twice.

Panels last ~25 years — the roof has to match

Do both on one schedule if shingles are tired

One crew for flashings and the array

$18–35k

Typical CT array, before incentives

New architectural shingles on a colonial

The roof decides the array

A rooftop array is a 25-year piece of equipment sitting on a roof that may have eight years left. Pulling modules, racking, and flashings off so you can tear off shingles is how a solar job becomes two jobs. If the shingles are tired, we replace them first — or we do the roof and the array on the same schedule.

Helio GC is the contractor for both. One crew has already been in the attic. Flashings and penetrations are the same company. You are not coordinating a solar installer who has never seen the deck.

What we look at before we size panels

Age of the shingles, ventilation, remaining life, electrical service, shade, and how you actually use power in winter. Incentives sit next to the cash number so you can compare. They are not a reason to skip the inspection.

Typical Connecticut rooftop arrays land $18,000–$35,000 before incentives in 2026. Batteries are quoted when the house and the panel can take them — not as an add-on after you have already signed.

Quick answers

Ready for a number on your house?

We'll write a planning range from the address or the scope, then come look.

CallEstimate my roof